PROJECT :
Sport and clubhouseSTATUS :
Conceptual design
CLIENT :
SEMedLOCATION :
Rangsit-NakornayokYEAR :
2022PROGRAMS :
Public buildingDESCRIPTION :
NPPN Company, the designer of the clubhouse project at Rangsit, shared that the main design consideration for the project was flood resilience. To achieve this, NPPN Company implemented several flood adaptation measures, such as using a high sloped roof to delay the flow of rainwater before it enters the ground.
In addition to flood resilience, NPPN Company mentioned that the curve of the building line was used to create a new approach and form for the clubhouse. This was done to enhance the visual appeal of the building and make it stand out in the surrounding area.
NPPN Company explained that the high sloped roof was an effective measure because it allows rainwater to flow quickly off the roof and into a drain, reducing the chances of flooding within the clubhouse. Additionally, NPPN Company mentioned that the use of a high sloped roof also helps to prevent damage to the building and its contents during a flood.
Overall, NPPN Company emphasized the importance of considering flood resilience in the design process, especially in areas prone to flooding like Rangsit. NPPN Company also expressed satisfaction with the outcome of the clubhouse project at Rangsit, stating that it is a well-designed and functional space that meets the needs of the client, Semed.
Full present can be downloaded here